Language selection

Search

Patent 3117017 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent: (11) CA 3117017
(54) English Title: METHOD AND SYSTEM FOR FORMING A PERMEABLE REACTIVE BARRIER IN THE GROUND
(54) French Title: METHODE ET SYSTEME POUR FORMER UNE BARRIERE REACTIVE PERMEABLE DANS LE SOL
Status: Granted
Bibliographic Data
(51) International Patent Classification (IPC):
  • E02D 31/00 (2006.01)
  • E02B 1/00 (2006.01)
(72) Inventors :
  • HALLIWELL, JOHN MARTIN (Canada)
(73) Owners :
  • HC PROPERTIES INC. (Canada)
(71) Applicants :
  • HC PROPERTIES INC. (Canada)
(74) Agent: TEITELBAUM & BOUEVITCH
(74) Associate agent:
(45) Issued: 2021-10-19
(22) Filed Date: 2021-05-04
(41) Open to Public Inspection: 2021-07-04
Examination requested: 2021-05-04
Availability of licence: N/A
(25) Language of filing: English

Patent Cooperation Treaty (PCT): No

(30) Application Priority Data: None

Abstracts

English Abstract

Doc. No. 328-14 CA Green Tech Patent ABSTRACT A system for forming a permeable reactive barrier includes a source conduit for providing a substantially dry barrier-forming material at an initial flow velocity. A delivery conduit arrangement is in fluid communication with the source conduit and includes a first delivery .. conduit and a second delivery conduit. The first and second delivery conduits each have an outlet end for being positioned proximate a bottom of respective spaced-apart boreholes in the ground. The first and second delivery conduits each have one or more openings defined in respective sidewalls thereof proximate the outlet ends thereof, for venting air that is entrained in the flow of the material. A total cross-sectional area of a flow path increases between the source conduit and the outlet ends of the first and second delivery conduits. During operation a final flow velocity of the barrier-forming material is at least about 30% less than the initial flow velocity. Date Recue/Date Received 2021-05-04


French Abstract

Document no 328-14 CA Demande de brevet lié à une technologie verte ABRÉGÉ Un système pour former une barrière réactive perméable comprend un conduit dadmission pour fournir un matériau formant une barrière sensiblement sec à une vitesse découlement initiale. Un système de conduits de distribution se trouve en communication fluidique avec le conduit dadmission et comprend un premier conduit dadmission et un second conduit de distribution. Les premier et second conduits de distribution ont chacun une sortie destinée à être positionnée à proximité dun fond de trous de forage placés à un certain écart lun de lautre dans le sol. Les premier et second conduits de distribution ont chacun une ou plusieurs ouvertures définies dans leurs parois latérales respectives à proximité de leurs sorties, pour évacuer lair qui est entraîné dans le débit de sortie du matériau. Une surface transversale totale dun circuit de flux augmente entre le conduit dadmission et les sorties des premier et second conduits de distribution. Pendant le fonctionnement, une vitesse découlement finale du matériau formant une barrière est dau moins environ 30 % inférieure à la vitesse découlement initiale. Date reçue/Date Received 2021-05-04

Claims

Note: Claims are shown in the official language in which they were submitted.


Doc. No. 328-14 CA
Green Tech Patent
CLAIMS
What is claimed is:
1. A method of forming a permeable reactive barrier in the ground for
remediating
groundwater, comprising:
drilling a plurality of boreholes in the ground; and
introducing a substantially dry barrier-founing material into two boreholes of
the
plurality of boreholes in a simultaneous fashion, comprising:
positioning a filling tool relative to the two boreholes such that an outlet
end of
a first delivery conduit of the filling tool is proximate a bottom of a first
one of the two
boreholes and an outlet end of the second delivery conduit of the filling tool
is
proximate a bottom of a second one of the two boreholes;
providing a flow of the substantially dry barrier-forming material at an
initial
flow velocity v, through a source conduit and into a flow divider, the flow
divider
having a first outlet in fluid communication with an inlet end of the first
delivery
conduit and a second outlet in fluid communication with an inlet end of the
second
delivery conduit; and
withdrawing the filling tool out of the two boreholes while continuing to
introduce the substantially dry barrier-forming material into the two
boreholes,
wherein a final flow velocity vf of the substantially dry barrier-forming
material exiting from
the outlet ends of the first and second delivery conduits is at least about
30% less than the
initial flow velocity võ and wherein withdrawing the filling tool is performed
at a rate that is
substantially equal to a rate of filling the two boreholes with the
substantially dry barrier-
forming material.
2. The method of claim 1, wherein the flow divider has an inside diameter that
is larger than
an inside diameter of the source conduit, and wherein the flow of the
substantially dry barrier-
forming material exits the flow divider via the first and second outlets at a
flow velocity v.,
that is intermediate the initial flow velocity v, and the final flow velocity
vf.
12
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
3. The method of claim 2, wherein the first and second delivery conduits each
include one or
more openings defined in sidewalls thereof for venting gas that is entrained
in the flow of the
substantially dry barrier-fonning material, thereby reducing the flow velocity
of the
substantially dry barrier-fonning material from the intennediate flow velocity
v,õ to the final
flow velocity vi.
4. The method of claim 1, wherein the substantially dry barrier-fonning
material comprises a
mixture of sand, granular iron or iron filings, and a thixotropic rheology
modifier.
5. The method of claim 4, wherein the thixotropic rheology modifier comprises
purified
magnesium aluminosilicate, wherein the substantially dry mixture has less than
20% moisture
content, and wherein the ratio of sand and thixotropic rheology modifier
suspension stabilizer
to granular iron or iron filings is at least 3:1.
6. The method of claim 4, wherein the thixotropic rheology modifier comprises
purified
attapulgite.
7. The method of claim 4, wherein the sand is silica sand or quartz sand.
8. A method as defined in claim 1, wherein each one of the first and second
delivery conduits
has a sensing ring disposed at or about the respective outlet end thereof, and
further
comprising a step of adjusting a rate of withdrawing the filling tool from the
two boreholes
based on sensed feedback relating to interaction between the sensing rings and
the
substantially dry barrier-fonning material within the boreholes.
9. A system for fanning a penneable reactive barrier in the ground for
remediating
groundwater, comprising:
a source conduit for providing a substantially dry barrier-fonning material at
an initial
flow velocity v,;
a flow divider having an inlet in fluid communication with an outlet end of
the source
conduit, and having a first outlet and a second outlet, wherein the flow of
the substantially dry
13
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
barrier-forming material exits the flow divider via the first and second
outlets at an
intermediate flow velocity v,õ that is lower than the initial flow velocity
v,;
a first delivery conduit having an inlet end in fluid communication with the
first outlet
and having an outlet end opposite the inlet end thereof;
a second delivery conduit having an inlet end in fluid communication with the
second
outlet and having an outlet end opposite the inlet end thereof;
wherein the first and second delivery conduits each comprise one or more
openings
defined in respective sidewalls thereof for venting gas that is entrained in
the flow of the
substantially dry barrier-forming material for reducing the flow velocity of
the substantially
dry barrier-fanning material from the intermediate flow velocity v,õ to a
final flow velocity vi.
10. The system of claim 9, wherein the flow divider has an inside diameter
that is larger than
an inside diameter of the source conduit.
11. The system of claim 9, wherein the first and second delivery conduits each
have a
respective inside diameter that is larger than an inside diameter of the
source conduit.
12. The system of claim 9, wherein each one of the first and second delivery
conduits has a
respective outside diameter and further comprise a sensing ring disposed at or
about the
respective outlet end thereof, the sensing ring having an outside diameter
that is larger than
the outside diameter of the respective one of the first and second conduits.
13. The system of claim 9, wherein the first and second delivery conduits are
substantially
parallel to one another and are spaced-apart by a center-to-center distance d,
and wherein
during operation the first and second delivery conduits are positioned within
respective
boreholes that are drilled into the ground and spaced-apart by approximately
the same center-
to-center distance d.
14. The system of claim 13, wherein the center-to-center distance d is between
about 30 cm
and about 90 cm.
14
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
15. A system for forming a permeable reactive barrier in the ground for
remediating
groundwater, comprising:
a source conduit for providing a substantially dry barrier-forming material at
an initial
flow velocity v,; and
a delivery conduit arrangement in fluid communication with the source conduit
and
having a first delivery conduit and a second delivery conduit, the first and
second delivery
conduits each having an outlet end for being positioned proximate a bottom of
respective
spaced-apart boreholes drilled into the ground, and the first and second
delivery conduits each
having one or more openings defined in respective sidewalls thereof proximate
the outlet ends
thereof for venting gas that is entrained in the flow of the substantially dry
barrier-forming
material,
wherein a total cross-sectional area of a flow path of the substantially dry
barrier-
forming material increases between the source conduit and the outlet ends of
the first and
second delivery conduits, and wherein during operation a final flow velocity
vf of the
substantially dry barrier-forming material exiting via the outlet ends of the
first and second
delivery conduits is at least about 30% less than the initial flow velocity
v,.
16. The system of claim 15, wherein the delivery conduit arrangement comprises
a flow
divider section having an inside diameter that is larger than an inside
diameter of the source
conduit, the flow divider section having a first outlet in fluid communication
with an inlet end
of the first delivery conduit and a second outlet in fluid communication with
an inlet end of
the second delivery conduit.
17. The system of claim 15, wherein the first and second delivery conduits
each have a
respective inside diameter that is larger than an inside diameter of the
source conduit.
18. The system of claim 15, wherein each one of the first and second delivery
conduits has a
respective outside diameter and further comprise a sensing ring disposed at or
about the
respective outlet end thereof, the sensing ring having an outside diameter
that is larger than
the outside diameter of the respective one of the first and second delivery
conduits.
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
19. The system of claim 15, wherein the first and second delivery conduits are
substantially
parallel to one another and are spaced-apart by a center-to-center distance d,
and wherein
during operation the first and second delivery conduits are positioned within
respective holes
that are drilled into the ground and spaced-apart by approximately the same
center-to-center
distance d.
20. The system of claim 19, wherein the center-to-center distance d is between
about 30 cm
and about 90 cm.
16
Date Recue/Date Received 2021-05-04

Description

Note: Descriptions are shown in the official language in which they were submitted.


Doc. No. 328-14 CA
Green Tech Patent
METHOD AND SYSTEM FOR FORMING A PERMEABLE
REACTIVE BARRIER IN THE GROUND
FIELD
The present invention relates generally to methods and systems for in situ
construction of a
subsurface containment region for containing hazardous waste or contaminated
soil buried
under in the ground, and more particularly to a method and system for forming
an
underground permeable reactive barrier.
BACKGROUND
Dr. Robert Gillham of the University of Waterloo, decades ago, discovered a
method of in-
situ treatment of chlorinated solvents by introducing iron filings into a
polluted ground source
of ground water.
Sayles et al. (Environmental Science and Technology, 1997) investigated the
utility of using
zero-valent iron (e.g., granular iron filings and the like) to dechlorinate
DDT and related
compounds in an anaerobic aqueous environment. Sayles et al. also acknowledged
the
importance of providing for a large surface-area of reactive iron, such as
that which could be
facilitated by the use of a fine particulate or powdered forms of iron. This
method became
popular and was used later by mixing iron filings with sand.
Currently, various techniques are known for forming zero-valent iron permeable
reactive
barriers. These known techniques can be classified based on whether placement
of the barrier
requires digging a trench or is achieved without digging a trench. Those
techniques that do
not require digging a trench may be further classified based on whether a
continuous or
discontinuous barrier is formed.
As will be apparent, barrier placements that require digging a trench are
limited to relatively
shallow depths, cause considerable disruption of the surface and subsurface,
and are not well
suited for areas in which the subsurface contains large cobbles or
consolidated rock
formations. On the other hand, barrier placements involving the drilling of
boreholes into the
1
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
ground can be used to form barriers to deeper depths than is possible using
trenched
techniques, and the presence of cobbles or consolidated rock formations is not
a major
concern.
One approach involves drilling a series of large diameter boreholes, which are
spaced closely
together such that adjacent boreholes overlap with one another. When a barrier
material is
placed into the boreholes, the resulting barrier is continuous along the
length of the series of
boreholes. Alternatively, a series of smaller diameter boreholes may be
drilled in a spaced-
apart arrangement and fracturing techniques may be used to open a space
between the
adjacent boreholes. Once again, when a barrier material is placed into the
boreholes, the
resulting barrier is continuous along the length of the series of boreholes.
Yet another
approach involves drilling an array of spaced-apart boreholes, which is
arranged in a plurality
of staggered rows. When a barrier material is placed into the boreholes, the
resulting barrier
is discontinuous, but the array is designed such that contaminated groundwater
must flow
through the barrier material in at least one of the boreholes in at least one
of the rows.
The use of staggered rows of boreholes to form a permeable reactive barrier is
particularly
attractive because greater depths may be reached, the barrier may be
constructed close to
property lines, and the subsurface composition is not problematic.
Unfortunately, the
boreholes tend to be relatively small in diameter (e.g., 6 inches), which
causes problems when
filling the boreholes with a substantially dry barrier-forming material, such
as for instance a
sand/iron filing mixture with a humidity level of about 20%. Typically, the
substantially dry
barrier-forming material is fed through a conduit that is inserted into the
borehole. The
borehole is filled from the bottom up, and the conduit is withdrawn as the
level of the
substantially dry barrier-forming material in the borehole rises. The barrier-
forming material
is normally entrained in a flow of a gas, such as for instance air, and is fed
into the borehole
with a high flow velocity. This may result in a significant amount of the
barrier-forming
material being blown back up the borehole and into the surrounding
environment. In
addition, the height of the barrier-forming material in the borehole may rise
faster than the
conduit is being withdrawn from the borehole, causing the outlet end of the
conduit to become
stuck in the borehole.
2
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
The need thus exists for an improved method and system that addresses the
above-mentioned
drawbacks.
SUMMARY
In accordance with an aspect of at least one embodiment there is provided a
method of
forming a permeable reactive barrier in the ground for remediating
groundwater, comprising:
drilling a plurality of holes in the ground; and introducing a substantially
dry barrier-forming
material into two holes of the plurality of holes in a simultaneous fashion,
comprising:
positioning a filling tool relative to the two holes such that an outlet end
of a first conduit of
the filling tool is proximate a bottom of a first one of the two holes and an
outlet end of the
second conduit of the filling tool is proximate a bottom of a second one of
the two holes;
providing a flow of the substantially dry barrier-forming material at an
initial flow velocity
through a source conduit and into a flow divider, the flow divider having a
first outlet in fluid
communication with an inlet end of the first conduit and a second outlet in
fluid
communication with an inlet end of the second conduit; and withdrawing the
filling tool out
of the two holes while continuing to introduce the substantially dry barrier-
forming material
into the two holes, wherein a final flow velocity of the substantially dry
barrier-forming
material exiting from the outlet ends of the first and second conduits is at
least about 30% less
than the initial flow velocity, and wherein withdrawing the filling tool is
performed at a rate
that is substantially equal to a rate of filling the two holes with the
substantially dry barrier-
.. forming material.
In accordance with an aspect of at least one embodiment there is provided a
system for
forming a permeable reactive barrier in the ground for remediating
groundwater, comprising:
a source conduit for providing a substantially dry barrier-forming material at
an initial flow
velocity; a flow divider having an inlet in fluid communication with an outlet
end of the
source conduit, and having a first outlet and a second outlet, wherein the
flow of the
substantially dry barrier-forming material exits the flow divider via the
first and second
outlets at a flow velocity that is lower than the initial flow velocity; a
first conduit having an
inlet end in fluid communication with the first outlet and having an outlet
end opposite the
inlet end thereof; a second conduit having an inlet end in fluid communication
with the
second outlet and having an outlet end opposite the inlet end thereof; wherein
the first and
3
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
second conduits each comprise one or more openings defined in respective
sidewalls thereof
for venting air that is entrained in the flow of the substantially dry barrier-
forming material for
reducing the flow velocity of the substantially dry barrier-forming material
from the
intemiediate flow velocity to a final flow velocity.
In accordance with an aspect of at least one embodiment there is provided a
system for
forming a permeable reactive barrier in the ground for remediating
groundwater, comprising:
a source conduit for providing a substantially dry barrier-forming material at
an initial flow
velocity; and a delivery conduit arrangement in fluid communication with the
source conduit
and having a first delivery conduit and a second delivery conduit, the first
and second delivery
conduits each having an outlet end for being positioned proximate a bottom of
respective
spaced-apart holes drilled into the ground, and the first and second delivery
conduits each
having one or more openings defined in respective sidewalls thereof proximate
the outlet
ends thereof for venting air that is entrained in the flow of the
substantially dry barrier-
forming material, wherein a total cross-sectional area of a flow path of the
substantially dry
barrier-forming material increases between the source conduit and the outlet
ends of the first
and second delivery conduits, and wherein during operation a final flow
velocity of the
substantially dry barrier-fomiing material exiting via the outlet ends of the
first and second
delivery conduits is at least about 30% less than the initial flow velocity.
BRIEF DESCRIPTION OF THE DRAWINGS
The instant disclosure will now be described by way of example only, and with
reference to
the attached drawings, in which:
FIG. 1 is a simplified diagram of a system or filling tool according to an
embodiment.
FIG. 2 is an enlarged partial view of the system or filling tool of FIG. 1.
FIG. 3 is a simplified view showing the system or filling tool of FIG. 1
positioned within two
adjacent boreholes of an array of boreholes.
4
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
FIG. 4 is a simplified side view showing the system or filling tool of FIG. 1
positioned within
two boreholes prior to filling with substantially dry barrier-fanning
material.
FIG. 5 is a simplified side view showing the system or filling tool of FIG. 1
positioned within
two boreholes during filling with substantially dry barrier-fanning material.
FIG. 6 is a simplified side view showing the system or filling tool of FIG. 1
positioned within
two boreholes after filling with substantially dry barrier-fanning material.
DETAILED DESCRIPTION
While the present teachings are described in conjunction with various
embodiments and
examples, it is not intended that the present teachings be limited to such
embodiments. On
the contrary, the present teachings encompass various alternatives and
equivalents, as will be
appreciated by those of skill in the art. All statements herein reciting
principles, aspects, and
embodiments of this disclosure, as well as specific examples thereof, are
intended to
encompass both structural and functional equivalents thereof. Additionally, it
is intended that
such equivalents include both currently known equivalents as well as
equivalents developed
in the future, i.e., any elements developed that perfonn the same function,
regardless of
structure.
As used herein, the tenns "first", "second", and so forth are not intended to
imply sequential
ordering, but rather are intended to distinguish one element from another,
unless explicitly
stated. Similarly, sequential ordering of method steps does not imply a
sequential order of
their execution, unless explicitly stated.
Referring now to FIG. 1, shown is a simplified diagram of a system or filling
tool according
to an embodiment. The system 100 includes a source conduit 102 as well as a
delivery
conduit arrangement, which is shown generally at 104. The delivery conduit
arrangement 104
includes a flow divider 106, a first delivery conduit 108 and a second
delivery conduit 110,
each of which has a wall thickness of about 0.6 cm. The flow divider 106 has
an inlet 112
that is in fluid communication with the source conduit 102 for receiving a
flow of a
substantially dry barrier-fonning material. The flow divider 106 divides the
flow of the
5
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
substantially dry barrier-fanning material into two, approximately equal flows
out of first and
second outlets 114 and 116 and into the first and second delivery conduits 108
and 110,
respectively.
A first sensing ring 118 is provided proximate the outlet end of the first
delivery conduit 108
.. and a second sensing ring 120 is provided proximate the outlet end of the
second delivery
conduit 110. In an embodiment, the sensing rings 118 and 120 are approximately
30 cm in
length and have a wall thickness of 2.5 to 3 cm. Since the sensing rings 118
and 120 have the
same inside diameter as the first and second delivery conduits 108 and 110,
the sensing rings
118 and 120 protrude outwardly from the outer surface of the first and second
delivery
conduits 108 and 110. The sensing rings 118 and 120 may be joined to the
outlet end of the
first and second delivery conduits 108 and 110 by a weld bead.
A first plurality of openings 122 is provided through the sidewall along a
length of the first
delivery conduit 108 that is above the sensing ring 118. Similarly, a second
plurality of
openings 124 is provided through the sidewall along a length of the second
delivery conduit
110 that is above the sensing ring 120. Additional openings (not illustrated)
are also fanned
on the sides of the first and second delivery conduits that are opposite the
openings 122 and
124 shown in FIG. 1. Alternatively, the openings 122 and 124 are provided in
the fonn of
elongated slots, or the number and/or size and/or distributions of the
openings 122 and 124
may be selected for a particular application.
Attachment points 126 and 128 are provided for the purpose of attaching
lifting cables (not
shown in FIG. 1), which allow a crane to be used to lower and raise the system
100 along a
substantially vertically path. Preferably, the source conduit 102 is flexible
and the delivery
conduits 108 and 110 are rigid and parallel to one another, to facilitate a
straight up-and-down
insertion and withdrawal of the system 100 into and out of boreholes that are
to be filled with
.. the substantially dry barrier-fanning material.
Referring now to FIG. 2, shown is an enlarged partial view of the system or
filling tool 100 of
FIG. 1, which shows more detail of the flow divider 106 and first delivery
conduit 108.
During operation, an inlet end (not shown in FIG. 2) of the source conduit 102
is in fluid
communication with a source of the substantially dry barrier-fanning material.
By way of a
specific and non-limiting example, the substantially dry barrier-fanning
material comprises
6
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
sand, such as for instance silica sand or quartz sand, mixed with iron
particles and a
thixotropic rheology modifier such as for instance attapulgite or Acti-Gel
(purified
magnesium aluminosilicate). In a specific implementation, 4 parts sand are
mixed with 1 part
iron particles and thixotropic rheology modifier. By way of a specific and non-
limiting
example, the source conduit 102 has an inside diameter of approximately 5 cm
and provides
an initial flow fT of the substantially dry barrier-fanning material with an
initial velocity v,.
The flow fT enters the flow divider 106 via inlet 112 and is divided into two
approximately
equal flows f; and f2. In the example that is shown in FIG. 2, the flow
divider 106 has an
inside diameter of approximately 7.5 cm. The combined effect of i) dividing
the initial flow
fT into two flows f/ and f2 and ii) providing a larger inside diameter within
the flow divider
106 compared to the source conduit 102 is to increase the total cross-
sectional area of a flow
path of the substantially dry barrier-forming material. In the instant
example, the total cross-
sectional area increases from about 19.5 cm2 in the source conduit 102 to
about 88.3 cm2 in
the flow divider 106. According to Bernoulli's principle, since the total
volumetric flow rate
of the substantially dry barrier-forming material is constant along the flow
path, the flow
velocity of the two flows fi and f2 in the flow divider 106 will be lower than
the flow velocity
within the source conduit 102, i.e., reduced from v, to an intermediate
velocity vm.
Referring still to FIG. 2, the flow fi passes along the length L of the first
delivery conduit,
which is typically 5 m to 15 m, through sections 200 and 202, each of which
has an inside
diameter approximately equal to the inside diameter of the flow divider 106,
i.e., an inside
diameter of about 7.5 cm. The plurality of openings 122 defined through the
sidewall of
section 202 vent a portion of the gas G within which the substantially dry
barrier-fanning
material is entrained. In some embodiments, the openings 122 are about 2.5 cm
in diameter
and are spaced apart from one another by about 15 cm. In some embodiments, two
rows of
openings 122 are provided along opposite sides of the section 202. Venting gas
G via the
openings 122 further reduces the velocity of the two flows fi and f2 from the
intermediate
velocity v,õ to a final velocity vf. By way of a few non-limiting examples,
the final velocity vf
of the flows fi and f2 exiting from the outlet ends of the first and second
delivery conduits 108
and 110, respectively, is at least 30% less, at least 40% less, at least 50%
less, or at least 60%
less than the initial flow velocity v, within the source conduit 102.
7
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
Now referring also to FIG. 3, the system or filling tool 100 may be used for
forming a
permeable reactive barrier in the ground for remediating groundwater, in which
an array of
boreholes 300 is formed in a plurality of staggered rows r1-r3 and then filled
with a barrier-
forming material. By way of a specific and non-limiting example, the bore
holes are
approximately 15 cm in diameter and are separated by a center-to-center
distance d of
approximately 45 cm. As will be apparent, the boreholes in the array 300 are
formed, e.g., by
drilling, such that the center-to-center separation corresponds to the center-
to-center
separation between the substantially parallel first and second delivery
conduits 108 and 110 of
the system 100. If the system 100 has a different configuration, such as for
instance a flow
divider that spaces the first and second delivery conduits 108 and 110 either
more closely
together or further apart, then the spacing between the adjacent boreholes in
the array 300 is
adjusted accordingly.
Of course, the depth of the boreholes in the array 300 depends on various
factors that are
specific to the site that is being remediated. A depth of about 5 m to 15 m
below ground
surface is typical. As will be apparent, one or more of the diameter, the
spacing, and the
depth of the boreholes may be smaller or larger than the above-mentioned
example
dimensions, e.g., depending on the particular constraints and requirements.
The boreholes
300 may be drilled or bored etc. through various types of subsurface
structures, including
consolidated rock formations or soils that contain cobbles of various sizes.
The formation of
a suitable array 300 of boreholes may be achieved using techniques that are
generally well
known to one of ordinary skill in the art and will not be discussed further
herein.
Now referring also to FIGS. 4-6, the system or filling tool 100 is positioned
within two
adjacent boreholes 302 and 304, such that the sensing rings 118 and 120 at the
outlet ends of
the first and second delivery conduits 108 and 110 are proximate the bottoms
400 and 402 of
the boreholes 302 and 304, respectively (FIG. 4). The boreholes 302 and 304
are filled with a
substantially dry mixture of sand, iron particles, granular iron or iron
filings, and a thixotropic
rheology modifier suspension stabilizer such as Acti-Gel . Some water may be
added to
mixture to dampen it, however the dry mixture will over time acquire moisture
in-situ in the
ground after the boreholes 302 and 304 are filled. Preferably quartz sand, or
silica sand is
used in the mixture. In operation the mixture may be added to a hopper and fed
into the
8
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
source conduit 102 using e.g., a not illustrated shotcrete compressed air
delivery system
capable of moving the mixture with the high initial velocity v,.
As the boreholes 302 and 304 are filled with the substantially dry barrier-
forming material
500 (FIGS. 5 and 6), the system 100 is withdrawn substantially vertically
upwards, as
indicated by the block arrow, at a rate that is approximately the same as the
filling rate of the
boreholes 302 and 304. For instance, cables 404 and 406 are attached to the
system 100 via
the attachment points 126 and 128, respectively, and a not illustrated crane
is used to lift the
system 100 out of the boreholes 302 and 304.
Referring again to FIGS. 1 and 2, the sensing rings 118 and 120 have the same
inside
diameter as the first and second delivery conduits 108 and 110, respectively,
but a larger
outside diameter. For instance, the outside diameter of the sensing rings 118
and 120 is
approximately 2.5 cm larger than the outside diameter of the first and second
delivery
conduits 108 and 110. The sensing rings 118 and 120 therefore protrude
outwardly from the
outer surfaces of the first and second delivery conduits 108 and 110. If the
crane operator
raises the system 100 at a rate that is slower than the rate at which the
boreholes 302 and 304
are being filled, then the protruding sensing rings 118 and 120 will become
buried in the
substantially dry barrier-forming material and the crane operator will sense
an increased
resistance to continued raising of the system 100. With experience, the crane
operator will
learn to vary the rate of raising the system 100 in response to sensed
feedback provided by the
sensing rings 118 and 120.
Advantageously, the reduced flow velocity that is achieved using the system
100, combined
with vertically lifting the system 100 during filling of the boreholes 302 and
304, results in the
simultaneous formation of void-free columns of the substantially dry barrier-
forming material
within the boreholes 302 and 304. The system 100 may then be positioned into
another pair
of adjacent boreholes, such as for instance boreholes 306 and 308, and the
boreholes 310 and
312 are filled, etc., and the process is repeated until all of the boreholes
of the array 300 are
filled. Advantageously, two boreholes may be filled at the same time, which
may reduce the
total time required to construct the permeable reactive barrier, since the
system 100 does not
need to be lowered into and withdrawn from each borehole individually.
9
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
As discussed above, the depth of the boreholes in the array 300 depend on the
constraints and
requirements of the site that is being remediated. Typical depths are in the
range of 5 m to 15
meters, but other depths are possible. The system 100 may be made in different
sizes to
accommodate different depth boreholes, for instance the length L in FIG. 2 may
be 5 m or the
length L may be 10 m or the length L may be 15 m. The relative sizes of the
sections 200 and
202 may be different in systems 100 having different lengths L. For instance,
the section 202
may have a length of about 3 m, and the section 200 may have a length that is
selected to
provide the desired total length L, e.g., 2 m or 7 m or 12 m. Alternatively,
the relative sizes of
the sections 200 and 202 may be the same in different systems 100 having
different lengths L.
Optionally, the system 100 may be disassembled to allow sections 200 and/or
202 of different
lengths to be used to suit the requirements for a particular application. For
instance, boreholes
having a depth of 15 m may be filled when the system 100 is assembled using a
section 200 of
12 m in length and a section 202 of 3 m in length. When it becomes necessary
to fill
boreholes that are only 10 m in depth, the section 200 of 12 m in length may
be "swapped
out" for a different section 200 of only 7 m in length. A kit of parts may
include a flow
divider, a pair of sections 202 of 3 m in length, and a plurality of pairs of
sections 200 of
various lengths. Optionally, the kit of parts further includes additional
pairs of sections 202 of
various lengths.
Throughout the description and claims of this specification, the words
"comprise",
"including", "having" and "contain" and variations of the words, for example
"comprising"
and "comprises" etc., mean "including but not limited to", and are not
intended to, and do not
exclude other components.
It will be appreciated that variations to the foregoing embodiments of the
disclosure can be
made while still falling within the scope of the disclosure. Each feature
disclosed in this
specification, unless stated otherwise, may be replaced by alternative
features serving the
same, equivalent or similar purpose. Thus, unless stated otherwise, each
feature disclosed is
one example only of a generic series of equivalent or similar features.
All of the features disclosed in this specification may be combined in any
combination, except
combinations where at least some of such features and/or steps are mutually
exclusive. In
particular, the preferred features of the disclosure are applicable to all
aspects of the
Date Recue/Date Received 2021-05-04

Doc. No. 328-14 CA
Green Tech Patent
disclosure and may be used in any combination. Likewise, features described in
non-essential
combinations may be used separately (not in combination).
11
Date Recue/Date Received 2021-05-04

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Administrative Status , Maintenance Fee  and Payment History  should be consulted.

Administrative Status

Title Date
Forecasted Issue Date 2021-10-19
(22) Filed 2021-05-04
Examination Requested 2021-05-04
(41) Open to Public Inspection 2021-07-04
(45) Issued 2021-10-19

Abandonment History

There is no abandonment history.

Maintenance Fee

Last Payment of $50.00 was received on 2023-04-21


 Upcoming maintenance fee amounts

Description Date Amount
Next Payment if small entity fee 2024-05-06 $50.00
Next Payment if standard fee 2024-05-06 $125.00

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Payment History

Fee Type Anniversary Year Due Date Amount Paid Paid Date
Application Fee 2021-05-04 $204.00 2021-05-04
Request for Examination 2025-05-05 $408.00 2021-05-04
Final Fee 2021-12-13 $153.00 2021-08-17
Maintenance Fee - Patent - New Act 2 2023-05-04 $50.00 2023-04-21
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
HC PROPERTIES INC.
Past Owners on Record
None
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Abstract 2021-05-04 1 24
Description 2021-05-04 11 585
Claims 2021-05-04 5 204
New Application 2021-05-04 9 250
Drawings 2021-05-04 6 187
Special Order - Green Granted 2021-07-06 1 175
Representative Drawing 2021-08-09 1 7
Cover Page 2021-08-09 1 38
Final Fee 2021-08-17 4 83
Representative Drawing 2021-09-27 1 4
Cover Page 2021-09-27 1 38
Electronic Grant Certificate 2021-10-19 1 2,527
Maintenance Fee Payment 2023-04-21 1 33
Office Letter 2024-03-28 2 189